ABB-led group to build world's largest battery storage system
In operation, BESS will produce power for several minutes to cover the time between a system disturbance and when the utility is able to bring back-up generation on line. GVEA placed the order with an ABB-led consortium which includes Saft AB, the battery company, which will supply a high performance nickel-cadmium storage battery made up of 13,760 energy cells in four strings. The first two battery strings are scheduled for commercial operation during the summer of 2003.
Reliable power is essential in Fairbanks, Alaska where winter temperatures can fall to – 51°C. At those temperatures, water pipes in the average home will freeze in about two hours.
Most read news
Topics
Organizations
Other news from the department research and development
Get the chemical industry in your inbox
By submitting this form you agree that LUMITOS AG will send you the newsletter(s) selected above by email. Your data will not be passed on to third parties. Your data will be stored and processed in accordance with our data protection regulations. LUMITOS may contact you by email for the purpose of advertising or market and opinion surveys. You can revoke your consent at any time without giving reasons to LUMITOS AG, Ernst-Augustin-Str. 2, 12489 Berlin, Germany or by e-mail at revoke@lumitos.com with effect for the future. In addition, each email contains a link to unsubscribe from the corresponding newsletter.