ABB wins $155 million oil and gas order in Kuwait
ABB has won a contract worth $155 million from the Kuwait Oil Company (KOC) for a turnkey project to design and build a new crude-oil transit line and associated ancillary systems.
The project includes the expansion of an existing manifold (a pipeline consolidation installation) at Point A, a location in the north of the country, and the installation of the new transit line. The 123 km, 30-inch-diameter transit line will run between oil fields in the north of the country and a storage facility in the south. It will be equipped with pipeline inspection gauges at 15 km intervals, a leak-detection system and metering stations.
The new installations are designed to transport up to 665 thousand barrels of oil per day from Point A to a tank farm in southern Kuwait. More than half of the oil will come from the newly established Jurassic field in northern Kuwait.
ABB will be responsible for the design, engineering, procurement, construction supervision, commissioning and start-up of the new system. ABB will also provide an automation system and distributed-control systems, as well as instrumentation, electrical equipment and an emergency-shutdown system. The project is scheduled for completion in spring 2012.
Other news from the department business & finance
Get the chemical industry in your inbox
From now on, don't miss a thing: Our newsletter for the chemical industry, analytics, lab technology and process engineering brings you up to date every Tuesday and Thursday. The latest industry news, product highlights and innovations - compact and easy to understand in your inbox. Researched by us so you don't have to.