ABB wins $73 million power order in Switzerland
For this upgrade, ABB will replace the existing multiple control systems with a single solution, based on its Extended Automation System 800xA. ABB will design, engineer, install, commission and test the installation, and is also responsible for upgrading the KKL simulator used for operator training.
To avoid any disruption in electricity supplies, the project will be carried out in phases that coincide with planned annual outages, starting in 2011 and running until 2018. Prior to installation, each stage of implementation will be extensively tested on a full-size test bed and on the KKL training simulator.
The initial scope of the new control system will include the ventilation systems, the demineralization plant and the cooling tower make-up water system, which makes up for losses due to evaporation. It will later be extended to incorporate the water steam cycle, the turbine controls, operational reactor support systems and other elements, under a frame agreement between ABB and KKL.
Most read news
Other news from the department business & finance
Get the chemical industry in your inbox
By submitting this form you agree that LUMITOS AG will send you the newsletter(s) selected above by email. Your data will not be passed on to third parties. Your data will be stored and processed in accordance with our data protection regulations. LUMITOS may contact you by email for the purpose of advertising or market and opinion surveys. You can revoke your consent at any time without giving reasons to LUMITOS AG, Ernst-Augustin-Str. 2, 12489 Berlin, Germany or by e-mail at revoke@lumitos.com with effect for the future. In addition, each email contains a link to unsubscribe from the corresponding newsletter.